Description of the project
We had a great challenge with this project: to completely respect the architectonic design.
The visibility towards both fronts of the grandstand was prioritized, by creating a line of vision of both the hockey and rugby pitches.
The locker rooms and the gym are located on the ground floor. There is a multipurpose room on the top floor. At the front part, there are bleachers facing the main pitch of the club.
The structure is a combination between a reinforced concrete structure and a metallic cover.
Our job
Design, calculation and measuring of the structure. Foundations. Structures on the ground and top floors. Metallic cover.
Setting out templates, assembly diagrams and bending spreadsheets of each structural element.
Detailed engineering of the metallic cover.
Plans and forms to present to local authorities.
Advice during preliminary design.
Site management during structure period.